Piling Rig SR150C
Piling Rig SR150C
Superior Performance Classic Model Piling rig SR150C is mainly used for pile foundation of medium and small-sized civil engineering. High Efficiency The first chassis equipped with Kawasaki load control system is highly efficient and energy saving; Main winch confluence technology, the maximum speed is 82m/min; The construction efficiency is increased by 10% compared with competitors. Flexibility Spacious cab; comfortable seat; flexible joysticks and intelligent control system Low Cost Low Fuel Consumption Engine output power intelligently matches the needs of system, fuel consumption is decreased by 5-10%. Easy to Transport With low transport weight, the piling rig can realize transport as a whole which facilitates assembly and disassembly. Convenient Service Short servicing time provides high profit. High Reliability Fine Production Full-automatic production line and robot welding ensure high quality; All the key components are jointly designed by world famous manufacturers and are customized. Rigorous Testing 100% nondestructive test of key components ensures high quality, stability and excellent performance of the piling rig.
Send Enquiry